01/12/2014

What is the installation period of fabric duct in a regular project?

In a regular project, there are lots of factors to influence the installation period, for example installation height, suspension mode, construction type, installation time (day or night), condition of the worksite and etc. So the installation period is uncertain. The average installation period is depends on the length, and the amount of the duct. For average calculate, the installation period of a 1000m fabric duct is 7 days, and increase in proportion to length. For example, a standard supermarket with 15000sqm, need 5 days to install with 4 labors.

16/07/2014

Design Selection & Installation Of IRR Air Duct System

Design

There is no big difference of the design procedures for traditional Durkeesox® system and IRRTM system.Only 4 common steps: system layout design; dimension selection; permeability selection; air supply mold selection.

 

Model Identification

1.IRR/N10/OΦ508x20/G(IRR/N10/O20"x65.6'/G)

Internal Retention Ring System, N general fabric with permeability of 1cfm/ft2 (18m3/m2/h), round, 508mm(20")in diameter, 20m(65.6ft) long, orifice air dispersion mode, single row suspension.

 

Installation

The installation of IRRTM system is much easier than any other duct system, due to adopting the single row suspension system, which consists of 2 styles: cable suspension system and aluminum track suspension system.

 

1.Cable Suspension System

Due to the cable suspension system is easy to install with low cost, it’s the most popular type in application.

 

2.AL-H Track Suspension System

Pulling cable is requested at the end of each straight duct to ensure smoothness and flatness of duct surface.

More information:http://www.durkeesox.com/en

21/01/2014

The successful reason of DurkeeSox Fabric air duct

One of important factor to influence the quality of fabric duct product is the production ability. Good fabric material quality, advanced production & machine,high quality design level made DurkeeSox textile ducting is a leader in Asia market.



1. large scale laser automatic production line.

The introduction of one of the largest automatic laser fabric air duct system production line, brings highest precision manufacturing to the industry.

2. System field test platform

All finished product under go system field test in the system field test lab, to ensure system perform as per customer request and system design.

3. Comprehensive product quality assurance systems

DurkeeSox fabric air dispersion is the only manufacturer certified under ISO 9001, 14001, OHS18001, and UL AJIJ / AC167 (Underwriter Laboratory).

4. Precise and fast delivery

With efficient management and streamlined production and logistic department, DurkeeSox textile ductwork bosts the shortest product lead time to meet the approaching dead lines.

5. Clear product labeling and tracking system

All finished products,a components and packages are systematically labeled and grouped for easy handling and installation. All production information are trackable with component product serial number.